What is the size of a settlement gauge?
Settlement Gauges are designed to measure relative displacements between adjacent monitoring points. different model of gauges can be adopted. Access tube: 3/4″ diameter. Cable length: 30-300 m. Rods length: 1, 2, 3 m. Rods diameter: 3/4″.
How can I measure the settlement of a site?
Measurements can also be taken automatic and remote by using special displacement transducers. If a multipoint settlement monitoring is requested, three different models of magnet settlement gauge are available: The BRS extensometer, the T-REX extensometer and the DEX in-place extensometer.
What types of magnet settlement gauges are available?
If a multipoint settlement monitoring is requested, three different models of magnet settlement gauge are available: The BRS extensometer, the T-REX extensometer and the DEX in-place extensometer.
What is a settlement plate?
Settlement plates are most commonly installed on an existing ground surface prior to the placement of an embankment, however they may also be successfully utilized in deep excavations. Settlement plates may be used alone or in conjunction with other instrumentation including piezometers,...
Why is settlement monitoring important?
What is multipoint settlement?
What is a hydrostatic profile gauge?
What is a fixed extensometer?
Is the BRS extensometer accurate?

What is Rod settlement gauge?
Rod Settlement Gauge Rod Settlement Gauge/Settlement Plate is typically installed during initial phase of construction and designed to monitor the immediate vertical ground settlement as well as long term.
What is settlement marker?
The settlement marker is used to measure a localised settlement or heave of roads, slopes, embankments, utility pipes and cables.
What is settlement plate?
Settlement plates or points are commonly installed where significant settlement is predicted (Dunnicliff, 1988) to record the magnitude and rate of settlement under a load. Therefore, they should be placed immediately after installing the vertical drains.
What is deep Levelling datum?
The permanent reference station or deep leveling datum is used as a reference for leveling measurement to other points, and shall be established on stable ground.
How does ground settlement marker work?
Structure settlement marker is used to monitor the movement of the existing buildings/ structures which may be affected by the works. Featuring a spherical head and a plated body that minimize damage to the building, the wall-mounted marker is installed around the external facade of the building.
What are settlement plates used for?
Settlement plates are used to monitor settlement induced by surcharges placed on compressible soils.
What are settlement tiles?
Settlements plates are man-made scientific devices that are designed to simulate the natural strata that corals settle on. Corals settle on the plates during a given time period, and the plates are removed and analyzed in a lab.
How does a Piezometer work?
Piezometer (Fig. 1.24) is used to measure underground water pressure. It converts water pressure to a frequency signal via a diaphragm and a tensioned steel wire. A change in pressure on the diaphragm causes a change in tension of the wire.
What is instrumentation and monitoring?
Instrumentation and monitoring technology are increasingly used to monitor structures, processes and infrastructure under construction and during the operational phase in order to verify design and planning and detect events in order to reduce risk.
What is a standpipe piezometer?
Standpipe Piezometers offer a simple and economic method for measuring water pressures in soil and rock. The Standpipe Piezometer (also known as a Casagrande Piezometer) is used to monitor piezometric water levels in vertical boreholes.
How do vibrating wire piezometers work?
The vibrating wire transducer inside the piezometer converts water pressure to a frequency signal via a diaphragm, a tensioned steel wire, and an electromagnetic coil. The transducer is constructed so that a change in water pressure on the diaphragm causes a change in the tension of the wire.
Settlement Gages - DocsLib
settlement gages. settlement gages . and settlement rods. geotechnical control procedure. gcp-15. revision #4. geotechnical engineering bureau. april 2007. geotechnical control procedure:
SETTLEMENT GAGES AND SETTLEMENT RODS - New York State Department of ...
EB 15-025 Page 3 of 28 I. INTRODUCTION This manual establishes uniform statewide procedures for fabrication, installation, documentation, maintenance and disposal of settlement gages and settlement rods.
Settlement Monitors - For Soils, Embankments, Earth, Dams - Geosense
Used to monitor settlement or heave in soils and other structures such as embankments, earth and rockfill dams. Systems range from simple rod & sleeve monitors to vibrating wire liquid level settlement and profiler systems.
What is a rod settlement gauge?
Rod Settlement Gauge/Settlement Plate is typically installed during initial phase of construction and designed to monitor the immediate vertical ground settlement as well as long term . Generally installed to verify design settlement assumptions and/or to check whether performance is as predicted with respect to installed PVDs and Surcharge. The settlement gauge comprises of a plate with attached measuring rods. The plate is positioned at the depth at which the settlement is prearranged to be measured and the plate level is recorded. During a typical monitoring session, the following information will be recorded: –
What is a prefabricated surface settlement marker?
Prefabricated surface settlement marker is used to monitor localized ground movement at specific locations. The settlement marker’s reduced level is compared against a temporary or permanent benchmark to monitor its settlement or heave. Settlement markers are typically installed to display the settlement of the finished ground, after surcharge.
What is a pipe surface settlement gage?
A pipe surface settlement gage indicates total foundation settlement behavior during and after embankment construction.
How does a manometer surface settlement gage work?
The manometer gage works on the principle that a fluid seeks its own level. The fluid line reflects any change in elevation between the base and readout box. The air line maintains the same atmospheric pressure at the base that exists at the readout box. The distance between the readout box and base should not exceed 230 ft. (70 m).
What is the settlement rod manual?
This manual establishes uniform statewide procedures for fabrication, installation, documentation, maintenance and disposal of settlement gages and settlement rods.
How to install a gage on a foundation?
These gages shall be installed at locations designated on the plans by driving or pressing the anchor post, using the outside casing (NPS 1) , from the surface of the embankment foundation to the elevation specified in the plans (see Figure 7). The anchors post shall then be expanded by tapping, with a small sledge hammer, the inside pipe (NPS ¼) while the outside casing is held in a fixed position. A 3 ft. (1 m) piece of pipe is now added to the inside pipe, wit the inside pipe held in a fixed position, the outside casing shall be detached at the left-hand threaded connection and retracted about 3 ft. (1 m) (see Figure 6).
How often are geotechnical readings recorded?
Readings for each installation are to be recorded weekly for one month commencing with the date of installation. Readings thereafter are recorded monthly until termination of the construction waiting period or otherwise for a period of time specified n the contract or by the Engineer. All readings are to be recorded, on Form GE 436, (see Figure 2), in triplicate, with one copy immediately forwarded to the Geotechnical Engineering Bureau, one to the Regional Geotechnical Engineer, and one to the project files.
When are settlement gages and rods abandoned?
All settlement gages and rods shall be abandoned after termination of the construction waiting period, unless the Geotechnical Engineering Bureau requests in writing that installations be retained for future readings. Procedures for abandonment are as follows:
What does a continuing analysis of instrumentation readings during construction indicate?
Continuing analyses of instrumentation readings during construction may indicate that a design waiting period can be reduced without detrimental effects on the final riding surface of the pavement. Moreover, actual and predicted behavior can be compared, thus improving future design methods on similar foundation materials.
Why is settlement monitoring important?
Settlement monitoring is essential to evaluate the possible problems and for risk management related to ground displacement on surface or underground constructions.
What is multipoint settlement?
The multipoint settlement system is an hydraulic system that can be used to monitor embankments or earth fill dams. The system consists of a number of pressure transducer hydraulically connected to an external reference vessel. This pressure transducers, equipped with a base plate are installed within the embankment.
What is a hydrostatic profile gauge?
The manual operated hydrostatic profile gauge is used for measuring vertical displacement in and below embankment. This easy to operate instrument of limited accuracy provides settlement profiles. Therefore a probe is pulled through a pipe previously installed in the embankment. The probe consists of a high precise pressure transducer that is interconnected to a reference vessel. The reference vessel is mounted on a electric hydraulic cable winch. The readings are taken with on the digital display at regular intervals by pulling the probe through the pipe.
What is a fixed extensometer?
Fixed extensometers are basically columns used to monitor the settlement between two points. The lower point is a platform installed within an embankment or an anchor installed in a borehole. At the top head usually settlement is measured by topographic surveying.
Is the BRS extensometer accurate?
The BRS extensometer being not a very accurate settlement gauge, but is inexpensive and allows measurement of many reference settlement points within one column. The T-REX incremental extensometer able to detect meter by meter ground settlement with high accuracy.